Installation and commissioning of the pin mixer granulator:


Installation: Before installing this machine, a prefabricated concrete platform must be laid. The base of the pelletizer should be secured to the platform using anchor bolts to facilitate operation and prevent movement. Additionally, the belt conveyor for material transportation must be aligned with the feed and discharge ports. Alternatively, a ground pit can be dug for material transport.


2. Debugging: After the granulator is installed, first inspect whether all components are securely fastened. Then conduct an unloaded test run, operating continuously for 8 hours without interruption. The temperature of each bearing should rise steadily, and at the end of the test, the temperature of each component must not exceed 50°C. After the test, observe that no severe wear or scratches should be present on any bearings.


Operating Precautions for the Twin-Screw Pelletizer:


Before turning on the machine, check for any foreign objects inside.


2. Check whether all parts of the machine are functioning properly.


3. This machine is strictly prohibited from starting under load.


4. After the machine is started, check whether the rotation direction is correct. If it rotates in the opposite direction, stop immediately and make adjustments. Proceed with production only after confirming stable rotation, free from abnormal noise or friction sounds.


5. It is strictly prohibited to introduce foreign objects such as iron blocks, stones, or wood into the machine to prevent equipment damage.


Before shutting down, ensure all internal materials are completely discharged to prevent them from adhering to the barrel, preparing for the next startup and facilitating the next shifts production.


7. Apply lubricating oil once per shift to the bearings, using calcium-based grease No. 3 with a filling amount of 1/3 to 1/2. Replace the lubricant regularly and clean the bearings during replacement.


8. Before using the reducer, lubricating oil must be added. The lubricating oil typically consists of No. HJ40-50 mechanical oil or No. HL20-3 gear oil. The oil level should be within the circular vernier indicator range on the base. After operating for 100 hours, the oil should be replaced with new oil, followed by a replacement every four months. Thorough cleaning is required when changing the oil.